Home
About Us
Building Cost
Building Take-Off
Price Quotes
Contact
Sitemap
Estimate
Consulting
Do it Yourself  Plan
Drawing Diagram
FAQ's
RSS / Blog
Home Disaster
Deck
Roof Estimates
Additions
Baths


Home



We can provide a detailed home written estimate residential and light commercial cost estimate of labor, material and other components for all phases of building construction and renovation. Know the price of each project before you get started. All labor and materials are average quality unless otherwise stated. Pricing is updated quarterly. All of the details for the project are provided by the customer. We are an estimate outsource provider for any size residential and light commercial project nationwide.

It is important to have a floor plan drawing with length, width and floor to ceiling dimensions plus door and window locations, wall offsets and closets for all rooms. This is needed for proper quantity, labor and material costs. More details will provide a true estimate for your project. Your detailed blueprint or scaled floor plan will be used to create a sketch drawing and is generated as a component of the estimate.

All estimates have description of line item detail, (see below part of bath estimate sample) material to be used, quantity, unit cost of each item, total cost calculation (sq/linear ft) and labor. Our material list has a description of the product, quantity, and the unit price; i.e. gallon(s), cubic yard, linear feet, square feet, or pound, then total price of the calculation. (See Estimate Sample)


Home Estimate Cost

 

425-677-5988

info@homeestimatecost.com

www.homeestimatecost.com

BATH SAMPLE

 

Proposed

Bath Remodel

Area Items:  Bath Remodel

 

DESCRIPTION                          QNTY                   REMOVE                         REPLACE                Total

 

135. 2x4”x12’ #2 & better Fir / Larch

3.00 EA

0.00

3.12

9.36

136. 2x4”x10’ #2 & better Fir / Larch

3.00 EA

0.00

2.59

7.77

137. 2x4”x8’ #2 & better Fir / Larch

151.00 EA

0.00

2.07

312.57

138. 2x4”x92 5/8” pre-cut stud 8’wall

305.00 EA

0.00

2.01

613.05

139. Sheathing – waferboard – ½”

2112.00 SF

0.00

0.68

1436.16

140. Labor to frame 2x4” non bearing wall – 16”oc

2322.67 SF

0.00

0.78

1811.68

58. Medicine cabinet – High grade

1.00 EA

0.00

2.19.17

2.19.17

59. re-skin toe kick

8.00

0.00

6.12

49.68

60. Vanity – high grade

4.00 LF

0.00

148.80

595.20

61. Mask per square foot for drywall or plaster work

47.33

0.00

0.13

6.15

62. ½” Water rock (greenboard) hung, taped ready for texture

378.67 SF

0.00

1.26

477.12

63. Texture drywall – machine

476.82 SF

0.00

0.27

128.74

64. 5/8” Drywall – hung, taped, floated, ready for paint

98.15 SF

0.00

1.41

138.39

65. Interior door unit

1.00 EA

0.00

191.92

191.92

66. Bath accessory – High grade

5.00 EA

0.00

27.55

137.75

67. Door knob – interior – High grade

1.00 EA

0.00

41.03

41.03

68. Rewire – average residence – copper

98.15 SF

0.00

2.40

235.56

69. Bathroom fan, light and heater

1.00 EA

0.00

183.87

183.87

70. Outlet

4.00 EA

0.00

8.22

32.88

71. Outlet box – includes 4 connectors and plaster ring

4.00 EA

0.00

41.28

165.12

72. Light bar – 5 lights – High grade

1.00 EA

0.00

179.79

179.79

73. Tile floor covering – High grade

98.15

0.00

9.42

924.57

74. Tile base

47.33

0.00

11.50

544.30

75. ½” Cement board

96.00 SF

0.00

2.97

285.12

76. Caulking – silicone

25.00 LF

0.00

1.92

48.00

77. Sill – cultured marble on 2x4” wall

4.00 LF

0.00

6.48

25.92

78. Vanity top – one sink – cultured marble – High Grade

4.00 LF

0.00

109.94

439.76

79. Mirror – ¼” plate glass

16.00 SF

0.00

9.34

149.44

80. Paint door slab only – 2 coats (per side)

1.00 EA

0.00

18.95

37.90

81. Paint door trim jamb – 2 coats ea

2.00 EA

0.00

19.17

95.85

82. Seal prime the surface area one coat

231.00 SF

0.00

0.33

76.23

83. Paint the surface area one coat

231.00SF

 

0.00

 

0.36

83.16

84. Mask and prep for paint

 

47.33 LF

0.00

0.83

39.28

 BATH ESTIMATE SAMPLE               5/26/2010                Pg: 10

 



Please provide us with Contact information and any questions for a new and upcoming project. We can email you a complete sample estimate in PDF. We write estimates for Contractors, Homeowners and Architects for Residential and Commercial Contractors engaging in interior and exterior whole house renovations, additions, new houses, and disaster reconstruction.

We write home estimates from blueprints or hand sketched drawing. Each professional estimate is written with software consisting of two elements: quantity survey and expense. The quantity survey is an organized list of the quantities of each type of material that goes into the structure. Quantity surveys are made from the construction plans and specifications. The home estimate cost converts quantities into expense for labor, material, and equipment and adds subcontracted items, overhead, contingency, and profit to arrive at the total expens


Home