Residential Consulting Estimating
Residential consulting estimating provides a detailed cost estimate of labor, material and other components for all phases of building, remodeling, renovation and disaster reconstruction. Know the price of each project before you get started. Let us write an estimate for you. We are an estimate outsource provider for any size project nationwide.
We write estimates from blueprints or hand sketched drawing. Each professional estimate is written with software consisting of two elements: quantity survey and expense. The quantity survey is an organized list of the quantities of each type of material that goes into the structure. Quantity surveys are made from the construction plans and specifications. The estimate cost converts quantities into expense for labor, material, and equipment and adds subcontracted items, overhead, contingency, and profit to arrive at the total expense.
ESTIMATE SAMPLE
DESCRFIPTION QNTY
REMOVE REPLACE TOTAL
|
1. 112" drywall- hung, taped, floated, ready |
889.44 SF |
0.00 |
1.24 |
1,102.91 |
|
for paint |
|
|
|
|
|
2. 5/8" drywall- hung, taped, floated, ready |
343.37 SF |
0.00 |
1.32 |
453.25 |
|
for paint |
|
|
|
|
|
3. Texture drywall- machine |
1,232.81 SF |
0.00 |
0.39 |
480.80 |
|
4. Mask wall - plastic, paper, tape (per LF) |
129.17 LF |
0.00 |
0.72 |
93.00 |
|
5. 110 volt copper wiring run and box - |
12.00 EA |
0.00 |
48.04 |
576.48 |
|
rough in only |
|
|
|
|
|
7. Rewire - average residence - copper |
343.37 SF |
0.00 |
3.68 |
1,263.60 |
|
wmng |
|
|
|
|
|
9. Crown molding - 5 3/8" to 6" stain grade |
129.17 LF |
0.00 |
8.29 |
1,070.82 |
|
10. Television cable outlet |
1.00EA |
0.00 |
67.04 |
67.04 |
|
11. Phone/low voltage outlet rough-in |
1.00EA |
0.00 |
43.89 |
43.89 |
|
12. Coaxial TV cable |
40.00LF |
0.00 |
1.29 |
51.60 |
|
13. Ceiling fan & light - Premium grade |
2.00EA |
0.00 |
508.61 |
1,017.22 |
|
14. Engineered wood flooring - High grade |
343.37 SF |
0.00 |
11.97 |
4,110.14 |
|
15. Add for glued down application over |
343.37 SF |
0.00 |
1.02 |
350.24 |
|
wood substrate |
|
|
|
|
|
16. Base shoe - stain grade |
95.00LF |
0.00 |
1.27 |
120.65 |
|
17. Baseboard - 3 114" |
95.00LF |
0.00 |
2.39 |
227.05 |
|
18. R&R Sill- cultured marble on 2" x 4" |
9.00 LF |
0.43 |
6.71 |
64.26 |
|
wall |
|
|
|
|
|
|
19. Mask and prep for paint - plastic, paper, |
129.17 LF |
0.00 |
0.72 |
93.00 |
|
tape (per LF) |
|
|
|
|
|
|
20. Paint baseboard - two coats |
95.00LF |
0.00 |
0.74 |
70.30 |
|
21. Paint the walls and ceiling - one coat |
1,232.81 SF |
0.00 |
0.31 |
382.17 |
|
22. Seal/prime the walls and ceiling - one |
1,232.81 SF |
0.00 |
0.29 |
357.51 |
|
coat |
|
|
|
|
|
|
23. 6-08-0 fiberglass sliding patio door - |
1.00EA |
0.00 |
2,381.27 |
2,381.27 |
|
High grade |
|
|
|
|
|
|
24. Vinyl window - double hung, 13-19 sf- |
2.00EA |
0.00 |
376.08 |
752.16 |
|
High grade |
|
|
|
|
|
|
25. Window Installer - per hour |
1.00 HR |
0.00 |
60.93 |
60.93 |
|
26. Smoke detector - High grade |
1.00EA |
0.00 |
74.37 |
74.37 |
|
27. Batt insulation - 12" - R38 |
343.37 SF |
0.00 |
1.21 |
415.48 |

Our estimates are written for Homeowners, Contractors, and disaster reconstruction. We will provide a detailed written project scope for labor and material for large and small projects of any size, nationwide. All information included in the estimate is based on the details provided by the customer for each room or project. Give us a call on your next project.

We can estimate any size room interior, kitchen, bathroom, flooring, windows, doors, trim, paneling & wall finishes, tile, drywall, framing, siding, roofing, electrical, plumbing, painting, insulation, heat & air, whole house renovation, exterior additions, or price out a new house. Homeowners, Contractors, Property Managers, Insurance Companies, and Adjusters with remodeling projects or fire and water damage needing disaster reconstruction estimates. Projects can be small or large.
Residential Consulting Estimating

|